So if you add up the replacement cost for Toll Gate assigned by the assessor (5 buildings) it comes to about $157M. For Pilgrim it is $36.5M (according to (gis.vgsi.com/warwickri/) (vgsi id = 40969 and 29480 respectively). This source is supposed to be accurate and current.

That’s a huge difference, so it looks like it’s possible to build a new facility if you wanted to well under what is being projected, or at least there is significant room to do something in-between, so I don’t understand the need for $350M in bonds, which is almost ten times Pilgrim’s replacement cost. The assessment data can’t be that messed up. Someone help me out here.